Skip to content
Back

Bow-tie analysis

  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Bow-tie analysis

A technique that maps the causes of an unwanted event, its possible consequences and the controls on each side; IEC 31010:2019 lists it among techniques for analysing controls (B.4.2).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Confidence level

The probability that the outcome will not exceed a given value; P80 is the value with an 80% chance of not being exceeded.

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Contingency

The difference between the point estimate and the estimate at the confidence level management chooses to fund (GAO-20-195G).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Control

A measure that maintains and/or modifies risk (ISO 31000:2018).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Current risk

Risk that has been at least partially addressed by management actions; the rating after existing controls (NIST IR 8286r1).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Escalation factor

A condition that can make a barrier fail or weaken it, such as poor maintenance or fatigue; it can have its own barriers.

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Estimate ranging

A class of quantitative methods that replaces fixed estimate values with three-point or uniform distributions, sets correlations and runs Monte Carlo simulation to obtain a cost distribution (AACE RP 118R-21).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Hazard

Something with the potential to cause harm, such as stored energy, a toxic substance or a critical dependency; the starting point of a bow-tie.

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Inherent risk

Risk conditions that would exist without any organisational interventions (NIST IR 8286r1).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Key performance indicator

A metric that gives a high-level view of performance, usually focused on results that have already occurred (COSO, 2010).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Key risk indicator

A metric used to provide an early signal of increasing risk exposure in an area of the enterprise (COSO, 2010).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Leading indicator

An indicator that changes before the risk event it relates to, often by tracking a root cause or intermediate event, so action can be taken in advance.

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Monte Carlo simulation

A technique that randomly samples values for uncertain inputs many times to simulate a model and build the probability distribution of its output (GAO-20-195G).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Preventive barrier

A control on the left of the bow-tie that stops a threat from leading to the top event.

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Recovery barrier

A control on the right of the bow-tie that limits the severity of consequences once the top event has occurred.

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Risk

The effect of uncertainty on objectives; the effect can be positive, negative or both (ISO 31073:2022, 3.1.1).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Risk appetite

The aggregate level and types of risk an institution is willing to assume within its risk capacity to achieve its strategic objectives and business plan (FSB, 2013).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Risk appetite framework

The policies, processes, controls and systems through which risk appetite is established, communicated and monitored, including the statement, limits and roles (FSB, 2013).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Risk appetite statement

The written articulation of the aggregate level and types of risk an institution will accept, or avoid, to achieve its objectives, with qualitative statements and quantitative measures (FSB, 2013).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Risk capacity

The maximum level of risk an institution can assume before breaching constraints set by capital, liquidity, the operating environment and obligations to stakeholders (FSB, 2013).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Risk detail record

A companion record to a register entry that holds historical information, detailed analysis and accountability details that do not fit in the register (NIST IR 8286Ar1).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Risk driver

A discrete risk modelled with a probability and an impact range that can affect several activities at once, used in AACE RP 57R-09 to integrate cost and schedule risk.

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Risk limits

Quantitative measures based on forward-looking assumptions that allocate the aggregate risk appetite to business lines, legal entities, risk categories and concentrations (FSB, 2013).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Risk management

Coordinated activities to direct and control an organisation with regard to risk (ISO 31000:2018).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Risk matrix

A table that maps likelihood and consequence ratings to a level of risk; listed in IEC 31010:2019 as a technique for recording and reporting.

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Risk owner

The designated party responsible and accountable for ensuring that a risk is maintained in accordance with enterprise requirements (NIST IR 8286r1).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Risk profile

A point-in-time assessment of gross and, where appropriate, net risk exposures aggregated within and across risk categories (FSB, 2013).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Risk register

A structured record of identified risks that typically holds a description of each risk, its impact and probability, mitigation, owner and a ranking to identify higher-priority risks (OMB Circular A-11, as cited in NIST IR 8286r1).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Risk source

An element which alone or in combination has the potential to give rise to risk (ISO 31000:2018).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Risk tolerance

The acceptable level of variation relative to achievement of a specific objective, often best measured in the same units as the objective (COSO, as quoted in the 2012 COSO risk appetite paper).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Root cause event

The underlying event that sets off a chain of intermediate events leading to a risk event; KRIs tied to root causes give the earliest warning (COSO, 2010).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

S-curve

The cumulative probability curve of simulated outcomes, read to find the cost or date that will not be exceeded at a chosen confidence level (GAO-20-195G).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Three Lines Model

The Institute of Internal Auditors’ model that separates management (first line), specialist risk and compliance roles (second line) and independent internal audit (third line) under board oversight.

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Top event

The moment control over a hazard is lost, placed at the knot of the bow-tie; threats lead to it and consequences follow from it.

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Triangular distribution

A distribution defined by minimum, most likely and maximum values; widely used for expert-elicited ranges in cost and schedule models.

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Trigger point

A pre-determined level of a KRI that, when reached, requires defined action or escalation by management (COSO, 2010).

Read More
  • Nexus publisher
  • Posted by Nexus publisher
October 30, 2026

Uncertainty

A state, even partial, of deficiency of information related to understanding or knowledge of an event, its consequence or likelihood (ISO 31073:2022, 3.1.3).

Read More