Search any place or open the world; the layers and generators follow disaster risk finance on the planet map, the globe and in 3D.
Ezezimali NezomnothoAny placeTwin builder
Houston and the Ship Channel, United States. Flat plan of the same data: relief as contours from the inline grid, the plants by capacity, the industrial points by kind and the numbers below. The 3D twin opens on devices that can draw it, once its data and code have been checked.
Terrain 0 to 66 m
30 power plants, 11,875 MW
7 refineries and chemical works
2 port land
29 named works
154 named industrial sites
Surface water extent, OPERA DSWx (HLS): read live when the 3D twin opens
Built-up and settlement extent, HBASE 2010: read live when the 3D twin opens
Credits and dates per layer are listed under the stage. Relief in the twin is exaggerated ×1.5 for legibility.
Drag to move, right drag or Shift with a drag to turn and tilt, Ctrl with the wheel to zoom. Keyboard: arrows move, Shift with arrows turn and tilt, + and – zoom, 0 resets, V steps through the views, Escape clears.
Power plants The 30 plants inside the box with nameplate capacity in MW and primary fuel, from the 2021 release, drawn as columns by capacity: the portfolio's assets. Power plants: Global Power Plant Database v1.3.0 (2021), World Resources Institute and partners, CC BY 4.0. release 1.3.0, 2021-06-02.Estimate: A 2021 snapshot, never current operating status; capacity is nameplate.
Surface water extent, OPERA DSWx (HLS) Open and partial surface water on the date shown, draped on the terrain around the assets. OPERA Dynamic Surface Water Extent from HLS, NASA JPL OPERA (contains modified Copernicus Sentinel data; USGS Landsat), via NASA GIBS, with the product date. Live: this page requests gibs.earthdata.nasa.gov when the layer is opened; the data date is printed with it.We acknowledge the use of imagery provided by services from NASA's Global Imagery Browse Services (GIBS), part of NASA's Earth Science Data and Information System (ESDIS).Estimate: A classification from optical imagery; clouds leave gaps; never a flood warning, a return-period hazard or a risk rating.
Built-up and settlement extent, HBASE 2010 Built-up extent in 2010 from Landsat as the exposure footprint around the assets. CIESIN, Columbia University, and NASA SEDAC: Global Human Built-up And Settlement Extent (HBASE) 2010. Live: this page requests gibs.earthdata.nasa.gov when the layer is opened; the data date is printed with it.We acknowledge the use of imagery provided by services from NASA's Global Imagery Browse Services (GIBS), part of NASA's Earth Science Data and Information System (ESDIS).Estimate: A 2010 classification; the year is printed.
Why this place: One box of about 77 by 66 kilometres holds the petrochemical complex of the Houston Ship Channel, Galveston Bay's refineries and terminals, and a city whose insured losses from Hurricane Harvey (2017) and the February 2021 freeze are the standard cases for catastrophe accumulation, protection gaps and the pricing of flood and power-outage risk. Data quality: the Global Power Plant Database lists the region's 30 plants with capacity and fuel, OpenStreetMap maps 192 refineries, terminals, works and industrial sites, Copernicus DEM GLO-30 covers the low relief, and OPERA surface-water detection and HBASE built-up extent load live from NASA GIBS. It connects to the Insurance, reinsurance and protection gaps, Disaster risk finance, Actuarial science, Climate and nature financial risk, Market, liquidity and treasury risk and Public finance and sovereign debt disciplines of the atlas.
Flat plan of the same data: relief as contours from the inline grid, the plants by capacity, the industrial points by kind and the numbers below. The 3D twin opens on devices that can draw it, once its data and code have been checked.
The boundaries, names and designations shown do not imply any judgement on the legal status of any territory, or any endorsement or acceptance of such boundaries. Countries: Natural Earth (public domain).
03The subject
The subject, methods and measures and debates and bodies
The field and its scope
For finance ministry, disaster management, development bank and insurance staff who need to arrange in advance how the cost of a disaster will be paid and by whom.
Quantities and units
Methods and their limits
Each method is listed with what it assumes and where it fails.
What the field debates
Bodies that set practice, and the data they publish
Bodies and standards are named so that learners can find and apply their published work. The Academy teaches the use of that work and links to the publisher. No affiliation is implied.
04The method
Layering disaster risk: reserves for the frequent, insurance for the rare, and the cost of what is left
A government faces frequent small disaster losses and rare large ones; each layer is cheapest to finance with a different instrument, and the retention level where reserves end and insurance begins sets the yearly cost of the whole strategy.
A completion record: the course, its version, the date and what was assessed, private by default and shared by you. It stacks into discipline, department and programme achievements. A record states what was studied and assessed and does not certify competence. A record is not a licence, a professional title or an employment status.
Idatha nezindawo zivelaphi?
Every faculty teaches on a twin of a real place built from open data. Each layer carries its provider, licence and date, and every result on the Academy states its source. Maps and figures are indicators for teaching, never an assessment of a place.
How do I take part beyond the courses in disaster risk finance?
Yakha iseli lekhono labantu abathathu kuya kwabayisikhombisa, fundani indlela yokufunda eyabelanayo, thatha umsebenzi ogadiwe emaqenjini okusebenza kazwelonke, noma lethe iqembu lesikhungo sakho. Open the page for organisations.
Amagama abalulekile
Igama
Risk layering
Matching financing instruments to events of different frequency and severity.
Igama
Parametric trigger
A payout rule based on a measured hazard parameter rather than assessed loss.
Igama
Basis risk
The mismatch between a parametric payout and the actual loss.
Igama
Catastrophe bond
A security that transfers defined catastrophe risk to investors.